Deck builders in Kingston & the Quinte region
New decks, rebuilds, stairs and railings in pressure-treated wood, cedar or composite. Built square, built to code, and built to survive Eastern Ontario winters. Free written estimates, and the only Kingston deck builder that publishes prices.
Deck construction, from footings to railing
A deck is six layers that each have to be right: footings below frost, posts, beams, joists, decking and the guard. Skip or shortcut one and the deck moves, squeaks or fails inspection. We build every layer to the Ontario Building Code and the City of Kingston's deck rules, which means 1.2 m footings, 6x6 posts, joists at 16 inches on centre and guards at 900 mm (1,100 mm when the deck is more than 1.8 m up).
Our crews set posts into limestone every week through Limitless Fences, so bedrock under your lawn doesn't stall your deck.
- New decks: ground-level platforms, raised decks off the back door, multi-level decks that step down to the yard
- Deck rebuilds: new boards and railings on a sound frame, or a full tear-out and rebuild
- Stairs and railings: wood, aluminum and glass railing, stairs to current code
- Pool and hot tub decks: decks around above-ground pools and framing that carries a full hot tub
- Built-ins: benches, planters, privacy screens and pergolas
Deck cost estimator for Kingston
Drag the size, pick the material, and get a working range in seconds. Send it with your estimate request and we'll start from there.
Deck cost estimator
Indicative 2026 ranges for the Kingston area. Your written estimate after a site visit is the real number.
Deck materials compared
| Pressure-treated | Cedar | Composite | |
|---|---|---|---|
| Installed cost (2026, Kingston area) | $35 to $50 /sq ft | $50 to $75 /sq ft | $60 to $90+ /sq ft |
| Upkeep | Clean and stain every 2 to 3 years | Stain or oil every 2 to 3 years | Wash once or twice a year |
| Typical life | 15 to 20 years | 20 to 25 years | 25 to 50 years, warrantied boards |
| Look | Natural wood, any stain colour | Rich grain, silvers if left bare | Consistent colour, wood-grain finish |
| Splinters and checking | Yes, as it ages | Some | No |
| Hot underfoot | Moderate | Moderate | Darker colours get hot |
Not sure which way to go? Read composite vs pressure-treated for Ontario, with a cost-over-time slider.
Deck permits in Kingston
A deck more than 600 mm above grade needs a building permit from the City of Kingston. We draw it, apply through DASH, book the three inspections and meet the inspector. Lower decks skip the permit but must still sit inside the Deck Bylaw setbacks. Use the permit checker for a quick answer.
Five days, start to finish
Layout & footings
Mark the deck, call locates, dig or drill footings to 1.2 m. Rock? We core it.
Frame
Posts, beams and joists. Ledger flashed to the house. Framing inspection if permitted.
Deck & stairs
Boards laid with hidden fasteners on composite, screws on wood. Stairs cut to code.
Railing & final
Guards set to height, final inspection, clean-up and walkthrough.
Get a free estimate
Send a few details and we'll call to book a site visit. Photos help, and you can send them once we reply. If you used a tool on this page, your answers come through with the form.
Phone: 343-459-7466
Hours: Mon to Fri, 8 am to 5 pm
Office: 945 Princess Street, Kingston, ON K7L 3N6
Deck questions
How much does a deck cost in Kingston?
Most decks we quote land between $35 and $90 per square foot installed, depending on material, height and railing. A 200 sq ft pressure-treated deck with wood railing is often $8,000 to $11,000; the same deck in composite with aluminum railing can reach $18,000 to $20,000. Our deck cost guide breaks this down.
Do I need a permit to build a deck in Kingston?
If the deck surface is more than 600 mm (2 ft) above grade, yes. Lower decks usually don't, but must still respect the Deck Bylaw setbacks. We prepare the drawings and DASH application when a permit is needed. See our deck permit guide.
Cedar or composite: which is better for Kingston?
Composite wins on upkeep and lasts longest; cedar looks best the day it's built and costs less than composite. Pressure-treated is the budget choice. We price all three so you can compare on one sheet.
How long does it take to build a deck?
Most residential decks take three to seven working days on site once the permit (if needed) and materials are in. Lead time from estimate to start is usually two to six weeks, longer in May and June.
Can you rebuild my old deck?
Yes. If the frame is sound we replace the boards and railings. If posts or joists have gone soft, we rebuild from the footings up and tell you which it is before we quote.
Do you handle the deck design as well as the build?
Yes. We draw the deck to scale for your permit and for you to approve, including stairs, railing style and any built-ins like benches or privacy screens.